NEWS

Permit Patrol: 15 October 2018

Work underway at WeHo office building, downtown Hyatt, east side vegan bakery

The Wedgewood-Houston property home to general contracting company Carter Group is prepped to see construction start on a three-story replacement building.

A permit, valued at $2.87 million, will allow for construction of the building’s shell.

The existing structure that houses the longstanding local business stands two stories and has an address of 517 Hagan St. It will be razed.

Melissa Pickney, Carter Group business development coordinator, told the Post in mid-September the company is eyeing a roughly 12-month construction timetable.

In addition to Carter Group, the planned building will be to home to two tenants, making it fully preleased. Pickney said the company is not ready to disclose the two future tenants or the cost to undertake the project.

Nashville-based Centric Architecture has designed the building for Carter Group, which had operated from the existing building since June 2009 and is now in a temporary space located at 2311 Kline Ave.

Contact Us

Keep in Touch
Please verify that you are not a robot.

Westgate Commercial

1600 Westgate Circle Ste 100,

Brentwood, TN 37027

Phone. 615-376-4500

Fax. 615-376-4555

Email. andrew@westgatecommercial.com